3 x ENERCON E147 EP5 – 5,0 MW, hub height 125 m eventually 3 x ENERCON E138 EP3 – 4,2 MW, hub height 130 m
LOCATION
Project plan in the Karlovy Vary region, launched in 2023, located in the cadastral municipality Skřipová, has the altitude ranging from 550 m to 570 m above sea level.
PROJECT DATA
3 x ENERCON E 147 EP5/5,0 MW, 125 m hub height, 147 m diameter rotor,
eventually 3 x ENERCON E 138 EP3/4,2 MW, 130 m hub height, 138 m diameter rotor.
Consent of the village with the investment plan.
Contractually secured land for construction.
EIA – Environmental Impact Assessment – submitted to the Regional Authority for consideration.
Based on the opinion of the RA on the EIA, a change in the zoning plan will be initiated.
Planning permission – expected in 2026.
Building permit – expected in 2026.
Construction of the wind farm in 2027 .
Expected yearly power generation approx. 25 000 000 kWh.
EIA – on the basis of the statements of the responsible authorities, VTE no. 3 was taken out of operation due to the negative impact on the environment.
COMMISSIONING
The construction of wind farm is expected in 2027.